Series 406 storefront Installation Instructions Part NO. Y016 February 2013
SECTION III FABRICATIONB - SHEAR BLOCKS AT SCREWSPLINE DOOR JAMBNOTE: (2) pc. horizontal (9357/9358) cannot be shear block assembled.INVERT #8401 HORI
TOP OF HORIZONTALFIG. #42"TO FINISHED FLOORB - SHEAR BLOCKS AT SCREWFOR TRANSOM - HEAD AND HORIZONTAL(4) holes are located# 26 Drill (.147 dia.),
SPLINE DOOR JAMBSECTION III FABRICATIONB - SHEAR BLOCKS AT SCREW3.320TO S.S. DOOR JAMB3) TEMPLATE FOR TRANSOM BAR SHEAR BLOCKDRILL JIGS ARE ALSO AV
B - SHEAR BLOCKS AT SCREWSECTION III FABRICATIONSPLINE DOOR JAMBFOR C.O.C.'S, PIVOTS, AND OTHER HINGING.ALL OTHER STD. 402 DOOR FRAME PREPS WILL
SPLINE DOOR JAMBSECTION III FABRICATIONB - SHEAR BLOCKS AT SCREWTRANSOM BAR SHEAR BLOCK TO DOOR JAMBUse # K977 shear block pkg.LOCATE TOP EDGE OFDRILL
B - SHEAR BLOCKS AT SCREWSECTION III FABRICATIONSPLINE DOOR JAMBLOCATE TOP EDGE OFDRILL JIG AT THETOP OF THE T-BARNOTE: The drill jig is reversible#4
C- SHEAR BLOCK FABRICATION - FRAMESKN65 FOR 9357 SILLK977 FOR 8401 HORIZ./SILLAT TUBULAR INTERMEDIATE HORIZONTALHORIZONTAL AND SILL END PREP FOR ATTAC
SECTION III FABRICATIONC- SHEAR BLOCK FABRICATION - FRAMES2) DJ18 DRILL GUIDE APPLICATION AT OPEN BACK TRANSOM HEADTRANSOM HEAD END PREP FOR ATTACH
D - SNAP-IN GLAZING POCKET &SECTION III FABRICATIONSCREW APPLIED GLAZING1) SNAP-IN GLAZING POCKET END PREPBACK WALL OF PART AS SHOWN.NOTCH THRO
A - DOOR FRAME ASSEMBLYK996 SIM.See #Y014 for International C.O.C. Installation Instructions.See #Y013 for Dorma C.O.C. Installation Instructions.If t
D) SNAP-IN GLAZING POCKET & SCREW APPLIED GLAZING1) SNAP-IN GLAZING POCKET END PREP2) SCREW APPLIED GLAZING END PREPS4) TEMPLATE for
SECTION IV ASSEMBLY & INSTALLATIONA - DOOR FRAME ASSEMBLYThe glazing pocket will flush with the top of the transom bar or withThe transom jamb gl
SECTION IV ASSEMBLY & INSTALLATIONA - DOOR FRAME ASSEMBLYEXPLODED VIEW#8400#9954/#9955 DOOR STOPOPPOSITE A C.O.C.AT A SINGLE DOOR.THIS ASSEMBLY I
Fig. # 18#8402 DOOR JAMBFACTORY PREP SHOWN#9954/#9955 DOOR STOPOPPOSITE A C.O.C.THIS ASSEMBLY ISAT A SINGLE DOOR.#K978#8400A - DOOR FRAME ASSEMBLYSECT
SECTION IV ASSEMBLY & INSTALLATIONA - DOOR FRAME ASSEMBLYDORMA RTS 88 w/ BUTT HINGES,#K996(BY DORMA)#8402 DOOR JAMBFACTORY PREP SHOWNF CLIPFig. #
#9954/#9955 DOOR STOPINSTALLATION INSTRUCTIONSREFER TO Y013 DORMA RTS 88FACTORY PREP SHOWN#8402 DOOR JAMBFig. # 20FT16F045#8400A - DOOR FRAME ASSEMBLY
K-153/K-154 Threshold Clip & Screws@ Concealed Rod PanicK-124/K-125 Threshold Clip & ScrewsThe door jamb runs to the@ Offset Pivots & Butt
#8400perimeter filler if structural loads require a greater shear strength at the anchor locations.NOTE: These are general anchor locations. It may be
C - SILL FLASHING INSTALLATIONINSTALL THE SILL FLASHING CONTINUOUSLY BETWEENSECTION IV ASSEMBLY & INSTALLATIONALL THERMAL STRUT SILL FLASHING THAT
WATER ONTO THE SILL FLASHING. SEE FIGURE BELOW.WITH SEALANT LEVEL WITH THE SILL FLASHING TO DIVERT ANY THOROUGHLY. FILL THE HOLLOW AREA OF THE DOOR
INCREASE IN THICKNESS, IF THE CONDITION IN IRREGULAR.INSTALLATION. THIS MAY CAUSE THE CAULK JOINT AT THE JAMB TO CONCEALED WITH THE SEALANT TO PRESEN
REFERENCE THESE OTHER MANUALS:INTERNATIONAL 200 CONCEALED OVERHEAD CLOSERSSTOREFRONT INSTALLATION INSTRUCTIONSDORMA RTS 88 CONCEALED OVERHEAD CLOSERSS
ALLOW 6" MINIMUM SPACING FROM THE VERTICALS. FOR MITERED LOCATE THE SPLICE JOINT DIRECTLY AT A VERTICAL INTERMEDIATE. K979 FOR S406 HIGH PERFOR
C - SILL FLASHING INSTALLATIONSECTION IV ASSEMBLY & INSTALLATIONSEALANT1 1/2"FIG. #3312" MIN.TO SPLICE JOINT3"TYP.STEP 6)1 1/2"
DOOR JAMB ASSEMBLYSECTION IV ASSEMBLY & INSTALLATIOND - SCREW SPLINE FRAME & SIDE LITE TONOTE: THE SILL FLASHING ENDS AT A DOOR JAMB.THE SILL
D - SCREW SPLINE FRAME & SIDE LITE TODOOR JAMB ASSEMBLYSECTION IV ASSEMBLY & INSTALLATIONEXPLODED VIEWMake sure the bead of sealant under the
SECTION IV ASSEMBLY & INSTALLATIONE - WATER DEFLECTOR INSTALLATIONGLASS UNIT BELOWFIG. #37HWD1 WATER DEFLECTORTYP. VERTICALHWD1 WATER DEFLECTORSea
Fig. # 39System 406 (2" sight line) = D.L.O. + 7/8" (VERTICAL)System 406 (2" sight line) = D.L.O. + 7/8" (HORIZONTAL)9358/93599250
E) Clean the glazing gaskets with denatured alcohol at the intersection area.Apply a small amount of sealant at the intersect area to marry the vertic
SECTION V GLAZINGB - GLASS INSTALLATIONTRANSOM BAR GLAZING STOP SEAL.STEP 1) GASKET INSTALLATION FOR OUTSIDE GLAZEIF SCREW APPLIED GLAZING STOPS ARE
Fig. # 42 If using antiwalk blocks, refer to page 38.CNOTE: ABB - GLASS INSTALLATIONSECTION V GLAZINGA) Position the glass unit in front of the openin
SECTION V GLAZING1/4 points of the D.L.O. Then lower the glass onto the setting blocks.F) Snap on the removable glass stop and install the exterior g
MDM 04/2006PARTPAGE 292509154NO.AT JAMBSFOR TRANSOM LITES OVER 4 FT.APPLIED FIXED SASHUSED w/ 9133 STOPDESCRIPTIONSCREW APPLIEDUSE w/ 9155 & W138J
steps on pages 36 and 37.FIG. # 44equal glass bite all around.E) Install the exterior gasket.C) Stretch the antiwalk block as shownin Fig. 44 below, a
SECTION V GLAZINGC - ANTIWALK BLOCK INSTALLATIONANTIWALK BLOCKREMOVE FROM THIS SIDEGASKETS REMOVEDC) Remove the antiwalk block with a sharphook shaft
#10 x 1" SL-HW-SMSATTACHMENT SCREWFRAME SPLINE PARTS IDENTIFICATIONDESCRIPTIONWATER DEFLECTOR @ INT. HORIZONTALSCREW SPLINESHEAR BLOCKSHEAR BLOCK
A - SCREW SPLINE FABRICATIONThese units are then erected by mating the male mullion with thepermits the preassembly of single units in the shop or at
.168O.G. HORIZONTALINVERT PATTERN FOR INSIDE GLAZE APPLICATIONSUSE BLOCKED OUT HOLE LOCATIONS FOR O.G. SCREW SPLINE APPLICATIONSDRILL JIGS ARE ALSO AV
SECTION III FABRICATIONA - SCREW SPLINE FABRICATIONFOR SCREW SPLINE APPLICATIONTO FINISHED FLOORTYP. VERTICAL2"FIG. #2spline assembly holes as po
AT THIS TIME FOR EASE OF ASSEMBLY.BLOCK PREPS, AS SHOWN ON PAGES 14 AND 15.PROCEED TO SECTION III C FOR HORIZONTAL TO SHEARTHESE PREPS SHOULD BE DONE
Comments to this Manuals