Page 1 - Series 406 storefront

 Series 406 storefront Installation Instructions Part NO. Y016 February 2013

Page 2 - TABLE OF CONTENTS

SECTION III FABRICATIONB - SHEAR BLOCKS AT SCREWSPLINE DOOR JAMBNOTE: (2) pc. horizontal (9357/9358) cannot be shear block assembled.INVERT #8401 HORI

Page 3 - SECTION I - GENERAL NOTES

TOP OF HORIZONTALFIG. #42"TO FINISHED FLOORB - SHEAR BLOCKS AT SCREWFOR TRANSOM - HEAD AND HORIZONTAL(4) holes are located# 26 Drill (.147 dia.),

Page 4 - SECTION II

SPLINE DOOR JAMBSECTION III FABRICATIONB - SHEAR BLOCKS AT SCREW3.320TO S.S. DOOR JAMB3) TEMPLATE FOR TRANSOM BAR SHEAR BLOCKDRILL JIGS ARE ALSO AV

Page 5

B - SHEAR BLOCKS AT SCREWSECTION III FABRICATIONSPLINE DOOR JAMBFOR C.O.C.'S, PIVOTS, AND OTHER HINGING.ALL OTHER STD. 402 DOOR FRAME PREPS WILL

Page 6 - A - SCREW SPLINE FABRICATION

SPLINE DOOR JAMBSECTION III FABRICATIONB - SHEAR BLOCKS AT SCREWTRANSOM BAR SHEAR BLOCK TO DOOR JAMBUse # K977 shear block pkg.LOCATE TOP EDGE OFDRILL

Page 7

B - SHEAR BLOCKS AT SCREWSECTION III FABRICATIONSPLINE DOOR JAMBLOCATE TOP EDGE OFDRILL JIG AT THETOP OF THE T-BARNOTE: The drill jig is reversible#4

Page 8

C- SHEAR BLOCK FABRICATION - FRAMESKN65 FOR 9357 SILLK977 FOR 8401 HORIZ./SILLAT TUBULAR INTERMEDIATE HORIZONTALHORIZONTAL AND SILL END PREP FOR ATTAC

Page 9

SECTION III FABRICATIONC- SHEAR BLOCK FABRICATION - FRAMES2) DJ18 DRILL GUIDE APPLICATION AT OPEN BACK TRANSOM HEADTRANSOM HEAD END PREP FOR ATTACH

Page 10 - SPLINE DOOR JAMB

D - SNAP-IN GLAZING POCKET &SECTION III FABRICATIONSCREW APPLIED GLAZING1) SNAP-IN GLAZING POCKET END PREPBACK WALL OF PART AS SHOWN.NOTCH THRO

Page 11

A - DOOR FRAME ASSEMBLYK996 SIM.See #Y014 for International C.O.C. Installation Instructions.See #Y013 for Dorma C.O.C. Installation Instructions.If t

Page 12

D) SNAP-IN GLAZING POCKET & SCREW APPLIED GLAZING1) SNAP-IN GLAZING POCKET END PREP2) SCREW APPLIED GLAZING END PREPS4) TEMPLATE for

Page 13

SECTION IV ASSEMBLY & INSTALLATIONA - DOOR FRAME ASSEMBLYThe glazing pocket will flush with the top of the transom bar or withThe transom jamb gl

Page 14

SECTION IV ASSEMBLY & INSTALLATIONA - DOOR FRAME ASSEMBLYEXPLODED VIEW#8400#9954/#9955 DOOR STOPOPPOSITE A C.O.C.AT A SINGLE DOOR.THIS ASSEMBLY I

Page 15

Fig. # 18#8402 DOOR JAMBFACTORY PREP SHOWN#9954/#9955 DOOR STOPOPPOSITE A C.O.C.THIS ASSEMBLY ISAT A SINGLE DOOR.#K978#8400A - DOOR FRAME ASSEMBLYSECT

Page 16

SECTION IV ASSEMBLY & INSTALLATIONA - DOOR FRAME ASSEMBLYDORMA RTS 88 w/ BUTT HINGES,#K996(BY DORMA)#8402 DOOR JAMBFACTORY PREP SHOWNF CLIPFig. #

Page 17

#9954/#9955 DOOR STOPINSTALLATION INSTRUCTIONSREFER TO Y013 DORMA RTS 88FACTORY PREP SHOWN#8402 DOOR JAMBFig. # 20FT16F045#8400A - DOOR FRAME ASSEMBLY

Page 18 - SCREW APPLIED GLAZING

K-153/K-154 Threshold Clip & Screws@ Concealed Rod PanicK-124/K-125 Threshold Clip & ScrewsThe door jamb runs to the@ Offset Pivots & Butt

Page 19 - A - DOOR FRAME ASSEMBLY

#8400perimeter filler if structural loads require a greater shear strength at the anchor locations.NOTE: These are general anchor locations. It may be

Page 20

C - SILL FLASHING INSTALLATIONINSTALL THE SILL FLASHING CONTINUOUSLY BETWEENSECTION IV ASSEMBLY & INSTALLATIONALL THERMAL STRUT SILL FLASHING THAT

Page 21

WATER ONTO THE SILL FLASHING. SEE FIGURE BELOW.WITH SEALANT LEVEL WITH THE SILL FLASHING TO DIVERT ANY THOROUGHLY. FILL THE HOLLOW AREA OF THE DOOR

Page 22

INCREASE IN THICKNESS, IF THE CONDITION IN IRREGULAR.INSTALLATION. THIS MAY CAUSE THE CAULK JOINT AT THE JAMB TO CONCEALED WITH THE SEALANT TO PRESEN

Page 23

REFERENCE THESE OTHER MANUALS:INTERNATIONAL 200 CONCEALED OVERHEAD CLOSERSSTOREFRONT INSTALLATION INSTRUCTIONSDORMA RTS 88 CONCEALED OVERHEAD CLOSERSS

Page 24

ALLOW 6" MINIMUM SPACING FROM THE VERTICALS. FOR MITERED LOCATE THE SPLICE JOINT DIRECTLY AT A VERTICAL INTERMEDIATE. K979 FOR S406 HIGH PERFOR

Page 25 - B - DOOR FRAME INSTALLATION

C - SILL FLASHING INSTALLATIONSECTION IV ASSEMBLY & INSTALLATIONSEALANT1 1/2"FIG. #3312" MIN.TO SPLICE JOINT3"TYP.STEP 6)1 1/2"

Page 26 - Fig. # 25

DOOR JAMB ASSEMBLYSECTION IV ASSEMBLY & INSTALLATIOND - SCREW SPLINE FRAME & SIDE LITE TONOTE: THE SILL FLASHING ENDS AT A DOOR JAMB.THE SILL

Page 27 - FIG. #27

D - SCREW SPLINE FRAME & SIDE LITE TODOOR JAMB ASSEMBLYSECTION IV ASSEMBLY & INSTALLATIONEXPLODED VIEWMake sure the bead of sealant under the

Page 28 - FIG. #28

SECTION IV ASSEMBLY & INSTALLATIONE - WATER DEFLECTOR INSTALLATIONGLASS UNIT BELOWFIG. #37HWD1 WATER DEFLECTORTYP. VERTICALHWD1 WATER DEFLECTORSea

Page 29 - VIEW OF JAMB AT CONDITION

Fig. # 39System 406 (2" sight line) = D.L.O. + 7/8" (VERTICAL)System 406 (2" sight line) = D.L.O. + 7/8" (HORIZONTAL)9358/93599250

Page 30 - FIG. #30

E) Clean the glazing gaskets with denatured alcohol at the intersection area.Apply a small amount of sealant at the intersect area to marry the vertic

Page 31 - FIG. #32

SECTION V GLAZINGB - GLASS INSTALLATIONTRANSOM BAR GLAZING STOP SEAL.STEP 1) GASKET INSTALLATION FOR OUTSIDE GLAZEIF SCREW APPLIED GLAZING STOPS ARE

Page 32 - FIG. #34

Fig. # 42 If using antiwalk blocks, refer to page 38.CNOTE: ABB - GLASS INSTALLATIONSECTION V GLAZINGA) Position the glass unit in front of the openin

Page 33 - EXPLODED VIEW

SECTION V GLAZING1/4 points of the D.L.O. Then lower the glass onto the setting blocks.F) Snap on the removable glass stop and install the exterior g

Page 34 - FIG. #36

MDM 04/2006PARTPAGE 292509154NO.AT JAMBSFOR TRANSOM LITES OVER 4 FT.APPLIED FIXED SASHUSED w/ 9133 STOPDESCRIPTIONSCREW APPLIEDUSE w/ 9155 & W138J

Page 35 - SECTION V GLAZING

steps on pages 36 and 37.FIG. # 44equal glass bite all around.E) Install the exterior gasket.C) Stretch the antiwalk block as shownin Fig. 44 below, a

Page 36

SECTION V GLAZINGC - ANTIWALK BLOCK INSTALLATIONANTIWALK BLOCKREMOVE FROM THIS SIDEGASKETS REMOVEDC) Remove the antiwalk block with a sharphook shaft

Page 37

#10 x 1" SL-HW-SMSATTACHMENT SCREWFRAME SPLINE PARTS IDENTIFICATIONDESCRIPTIONWATER DEFLECTOR @ INT. HORIZONTALSCREW SPLINESHEAR BLOCKSHEAR BLOCK

Page 38

A - SCREW SPLINE FABRICATIONThese units are then erected by mating the male mullion with thepermits the preassembly of single units in the shop or at

Page 39 - STEP 2) GLASS INSTALLATION

.168O.G. HORIZONTALINVERT PATTERN FOR INSIDE GLAZE APPLICATIONSUSE BLOCKED OUT HOLE LOCATIONS FOR O.G. SCREW SPLINE APPLICATIONSDRILL JIGS ARE ALSO AV

Page 40

SECTION III FABRICATIONA - SCREW SPLINE FABRICATIONFOR SCREW SPLINE APPLICATIONTO FINISHED FLOORTYP. VERTICAL2"FIG. #2spline assembly holes as po

Page 41

AT THIS TIME FOR EASE OF ASSEMBLY.BLOCK PREPS, AS SHOWN ON PAGES 14 AND 15.PROCEED TO SECTION III C FOR HORIZONTAL TO SHEARTHESE PREPS SHOULD BE DONE