Series 526 Thermal impact storefront Installation Instructions Part NO. Y021 February 2013
EFCO 6/2012 Page 10 Series 526 Impact Installation Instructions SECTION III: Fabrication B. Drilling Template for Screw Spline at Vertic
EFCO 6/2012 Page 11 Series 526 Impact Installation Instructions SECTION III: Fabrication C. Drilling Template for Screw Spline at Vertic
EFCO 6/2012 Page 12 Series 526 Impact Installation Instructions SECTION III: Fabrication D. Drilling Template for Screw Spline at Vertic
EFCO 6/2012 Page 13 Series 526 Impact Installation Instructions SECTION III: Fabrication E. Drilling Template for Shear Blocks at Vertic
EFCO 6/2012 Page 14 Series 526 Impact Installation Instructions SECTION III: Fabrication F. Drilling Template for Shear Blocks at Vertic
EFCO 6/2012 Page 15 Series 526 Impact Installation Instructions SECTION III: Fabrication G. Drilling Template for Shear Blocks at He
EFCO 6/2012 Page 16 Series 526 Impact Installation Instructions SECTION III: Fabrication H. Drilling Template for Shear Blocks at Horizo
EFCO 6/2012 Page 17 Series 526 Impact Installation Instructions SECTION IV: Frame Assembly A. Preset Gasket Installation for Dry Glazed
EFCO 6/2012 Page 18 Series 526 Impact Installation Instructions SECTION IV: Frame Assembly B. Screw Spline Assembly Inside Glazed and
EFCO 6/2012 Page 19 Series 526 Impact Installation Instructions SECTION IV: Frame Assembly C. Door Frame Shear Block Assembly Outside
EFCO 6/2012 Page 2 Series 526 Impact Installation Instructions TABLE OF CONTENTS SECTION PAGE
EFCO 6/2012 Page 20 Series 526 Impact Installation Instructions SECTION IV: Frame Assembly D. Horizontal Thru Shear Block Assembly I
EFCO 6/2012 Page 21 Series 526 Impact Installation Instructions SECTION V: Door Frame Installation Step 1) General Notes
EFCO 6/2012 Page 22 Series 526 Impact Installation Instructions SECTION V: Door Frame Installation Step 3) Subsill Sealant at Door Fram
EFCO 6/2012 Page 23 Series 526 Impact Installation Instructions [Fig. 3] 9914 16H4 16H5 9155 4437 [Fig. 4] SECTION V: Door Frame Installa
EFCO 6/2012 Page 24 Series 526 Impact Installation Instructions STC6 [Fig. 7] Prior to installing the end dam, apply a generous amount of
EFCO 6/2012 Page 25 Series 526 Impact Installation Instructions SECTION VI: Subsill Fabrication and Installation Step 3) Subsill Weep F
EFCO 6/2012 Page 26 Series 526 Impact Installation Instructions Before installing the subsill, the exterior face location of the frame sho
EFCO 6/2012 Page 27 Series 526 Impact Installation Instructions [Fig. 15] [Fig. 14] Silicone Sealant Clean and Degrease Thoroughly. [Fig.
EFCO 6/2012 Page 28 Series 526 Impact Installation Instructions SECTION VI: Subsill Fabrication and Installation Step 9) Sealing the En
EFCO 6/2012 Page 29 Series 526 Impact Installation Instructions SECTION VI: Subsill Fabrication and Installation Step 10) Splicing the
EFCO 6/2012 Page 3 Series 526 Impact Installation Instructions SECTION I: General Notes and Guidelines The Series 526 is a thermally brok
EFCO 6/2012 Page 30 Series 526 Impact Installation Instructions [Fig. 21] Sill isolator placed at 1/4 points and held in place with sealan
EFCO 6/2012 Page 31 Series 526 Impact Installation Instructions 2” 16” MAX. 16” MAX. 16” MAX. 2” [Fig. 25] Ensure that the frame jamb is t
EFCO 6/2012 Page 32 Series 526 Impact Installation Instructions [Fig. 27] For D.L.O.s 22" and narrower, the anchors must be spaced 2&
EFCO 6/2012 Page 33 Series 526 Impact Installation Instructions Prior to installing an intermediate vertical mullion or perimeter jamb, ap
EFCO 6/2012 Page 34 Series 526 Impact Installation Instructions Make sure that the anchors are installed into the head and jamb of the fir
EFCO 6/2012 Page 35 Series 526 Impact Installation Instructions In some cases, it may be necessary to use a clamping device to get the mul
EFCO 6/2012 Page 36 Series 526 Impact Installation Instructions [Fig. 35] Backer Rod Backer Rod [Fig. 34] [Fig. 33] [Fig. 32] Sealant All
EFCO 6/2012 Page 37 Series 526 Impact Installation Instructions The setting block for standard frame horizontals is HEP0. The door header
EFCO 6/2012 Page 38 Series 526 Impact Installation Instructions Ensure that each vertical DLO has at least one DEEP glass pocket on either
EFCO 6/2012 Page 39 Series 526 Impact Installation Instructions Glass size formulas are D.L.O. + 1 1/8" for both horizontal and verti
EFCO 6/2012 Page 4 Series 526 Impact Installation Instructions SECTION II: Parts Identification Chart Vertical Parts: 16G1 Perimeter J
EFCO 6/2012 Page 40 Series 526 Impact Installation Instructions SECTION VIII: Glazing Step 3A) Glass Size Formulas and Glass Bite (Hori
EFCO 6/2012 Page 41 Series 526 Impact Installation Instructions Edge of Glass Water Deflector FWB0 Sealant [Fig. 40] [Fig. 41] Install the
EFCO 6/2012 Page 42 Series 526 Impact Installation Instructions D.L.O. 9” O.C. Max. 9” O.C. Max. 2” 1/2” 7/16” [Fig. 43] “V” Groove 2” Bef
EFCO 6/2012 Page 43 Series 526 Impact Installation Instructions Sealant [Fig. 44] The preset gasket will need to be pulled out of the corn
EFCO 6/2012 Page 44 Series 526 Impact Installation Instructions SECTION VIII: Glazing Step 6) Glass Installation A
EFCO 6/2012 Page 45 Series 526 Impact Installation Instructions The 16G3 glass stop has a hook leg that has to go past the frame hook leg
EFCO 6/2012 Page 46 Series 526 Impact Installation Instructions Stretch the anti-walk block out as flat as possible, and insert it in betw
EFCO 6/2012 Page 47 Series 526 Impact Installation Instructions Ensure that the glass, setting blocks, snap-in glazing bead, and anti-walk
EFCO 1/2013 Page 48 Series 526 Impact Installation Instructions After installing the 16G3 glass stop, run a bead of silicone type sealant
EFCO 6/2012 Page 49 Series 526 Impact Installation Instructions The glass stop cover (16G4) is snapped in place after the drive-in gasket
EFCO 6/2012 Page 5 Series 526 Impact Installation Instructions SECTION II: Parts Identification Chart Horizontal Parts: 4G77 Outside G
EFCO 6/2012 Page 50 Series 526 Impact Installation Instructions When glazing a wet glazed unit, follow all the previous instructions in th
EFCO 6/2012 Page 6 Series 526 Impact Installation Instructions KP01 Head & Horizontal Shear Block Package Use With 16H2 & 16G2 K87
EFCO 6/2012 Page 7 Series 526 Impact Installation Instructions FWB0 Water Deflector Use @ 16H2 KP00 Subsill End Cap Use @ 4G79 HC03 Subsil
EFCO 6/2012 Page 8 Series 526 Impact Installation Instructions SECTION II: Parts Identification Chart Miscellaneous: KP08 Dorma RTS-88
EFCO 6/2012 Page 9 Series 526 Impact Installation Instructions SECTION III: Fabrication A. Drilling Template for Screw Spline at Vertica